Avocado Box Entrance

Almeria Developers

Almeria Luxury Villas

2024 - 2028

Role: Design Project Manager / Cordinator

Status: Permiting

Completion: 2026-2028


Developer: Almeria Developers LLC

General Contractor: HD Development & Construction LLC


Surveyor: Landtec Surveying and Lien

Geotecnichal Engineers: Whitestone Associates

Environmental Engineer: EW Consultants, Inc

Civil Engineer: A.J. Hydro Engineering, Inc

Planner and Landscaping: Schmidt Nichols Landscape 

Traffic Analysis:O’Rourke Engineering & Planning

Solar Energy Consultant: Eccentric Dynamic Capital LLC

Preliminary Architectural Design: HD Development & Construction.

Amenities Architectural Design: Maple Studio LTD

Architect in Record: Leon Architects LLC

Structural Engineer: CFS Engineering

Structural Shop Drawings: Accurate Steel Fab.

MEP Engineer: Protek Electrical Engineering Inc.

FBGC Green Certification: Two Trails LLC


Construction Method: Eco-Hybrid - Steel Framing with Light Weight Concrete

Location: Port St Lucie, FL

Area: ~92,000 sq ft under A/C 

Lot Area: 13.3 Acres